Author |
Message |
PMB
Site Moderator
Location: WA/MT Joined: Wed Mar 6, 2013 Posts: 12076
|
We're planning a bunch of new raised beds, and if I could be 100% certain that the plastics wouldn't leach estrogen mimicking chemicals I'd build them with the plastic boards for longevity. Alas. So mine will be made of good wood, and I'll just plan on replacing them every 5 years or so.
Side jaunt on plastic vs wood... Back to your regularly scheduled programming.
_________________ "I like causing trouble, but only if I'm aware of it. To think I created a problem by accident was disappointing." Traut "A snorkel, a sheet of visqueen, a gallon of KY and that looks like a pretty good Saturday night at jukk0u's!" "The greatest challenge that I faced was peeling back the layers of my own bias" "There are violent crazy murderous people in our society! We need to give up all of our means of self-protection IMMEDIATELY!"
|
Wed Jun 19, 2019 6:56 am |
|
 |
mislabeled
Mod Broad
Location: N-Sno Joined: Thu Oct 3, 2013 Posts: 3816
|
Massivedesign wrote: I’m about to redo my 600sf deck using TimberTek and it’s only about $4k in materials. I’ll be doing the work myself. That price is tempting. I'll have to check them out. Looks like we might be redoing our deck (top decking only) this summer.
_________________ "Hmmm. I've been looking for a way to serve the community that incorporates my violence." -- Leela
|
Wed Jun 19, 2019 9:02 am |
|
 |
Old Growth
Location: Nisqually Valley Joined: Wed Oct 5, 2016 Posts: 2102
|
600 sq feet of cedar would be about 2k
|
Wed Jun 19, 2019 10:22 am |
|
 |
jeffbur
Site Supporter
Location: Redmond, WA Joined: Sun Jul 22, 2012 Posts: 37
|
My deck is a second story and requires a full replacement. I priced out all of the materials from both Dunn and Lowe’s.
The materials costs run between 8-10K. The permit for the city is 500-1K
_________________ -Jeffbur
|
Wed Jun 19, 2019 10:56 am |
|
 |
Massivedesign
Site Admin
Location: Olympia, WA Joined: Fri Mar 11, 2011 Posts: 34135
Real Name: Dan
|
Old Growth wrote: 600 sq feet of cedar would be about 2k I want 20' sticks. Also need to do quite a bit of structure work. That 4k price I put on was for everything I wanted to do (picture frame, some benches, firebowl area, sono tubes for future covered area etc).
|
Wed Jun 19, 2019 11:12 am |
|
 |
usrifle
Site Supporter
Location: RENTON Joined: Fri Mar 25, 2011 Posts: 11212
Real Name: John
|
You need a 500-1000 dollar Permit to simply replace an existing deck with the same design/Layout? 
_________________ Mr. Q wrote: so basically, if you have to smoke some asshole, make sure they become fertilizer and then Bounce? got it.
NRA Member/RSO SAF 5 Year Donor GOA Member
|
Wed Jun 19, 2019 11:28 am |
|
 |
RockHopper
Site Supporter
Location: Parkland Joined: Mon Nov 25, 2013 Posts: 1315
Real Name: Jeremy
|
usrifle wrote: You need a 500-1000 dollar Permit to simply replace an existing deck with the same design/Layout?  The only folks who "need" that permit, is the leaches in county govt.
_________________ . Women scare me - all soft and playful on the outside, all berserker Ragnarok killing machines upstairs in the control room. Rencorp .
|
Wed Jun 19, 2019 12:07 pm |
|
 |
Old Growth
Location: Nisqually Valley Joined: Wed Oct 5, 2016 Posts: 2102
|
usrifle wrote: You need a 500-1000 dollar Permit to simply replace an existing deck with the same design/Layout?  That way they know RIGHT AWAY to reassess your property value since you upgraded that old decks quality!
|
Wed Jun 19, 2019 1:25 pm |
|
 |
jeffbur
Site Supporter
Location: Redmond, WA Joined: Sun Jul 22, 2012 Posts: 37
|
Probably true but it comes back to bite you when you sell the house.
_________________ -Jeffbur
|
Wed Jun 19, 2019 5:51 pm |
|
 |
DoveRelease
Location: Arlington wa Joined: Tue Oct 30, 2018 Posts: 315
Real Name: Patrick
|
jukk0u wrote: Old Growth wrote: Plastic decks!! I chuckle! couple of things: Go to Dunn lumber or other places where they have decks or segments installed in the showroom. They depict tightly mitered corners and end seams. Yet the manufacturers state that at least 1/4" gap at the ends must be maintained to allow for thermal expansion. So those tight butts they show in the environmentally controlled showroom aren't achievable in the real world AND, When installing the plastic decking, is that gap set in the morning when the decking is cold, or midafternoon after it has warmed up? Presumably it isn't ALL being cut and set in the same hour, if the deck has any size or complexity. The neighbor has a plastic deck erected when those products were first introduced. The thermal expansion is around 3/4"!! It has torn itself apart and cracked at the fasteners, interestingly, on all the vertically installed pieces (fascia, stair risers). In the winter his mitered joints and fascia corners are tight. By mid spring there are finger sized gaps at the corners. He hired me to do some remediation on it and I cut oversized oval holes for every fastener (and used washers) to provide for this expansion. If all else fails, read the directions.
|
Mon Jul 01, 2019 4:53 pm |
|
 |
RocketScott
Site Supporter
Location: Tacoma Joined: Fri Jan 16, 2015 Posts: 4989
|
If any of you guys want me to check pricing through my lumber yard (Evergreen in Port Orchard) I'd be happy to
They mostly sell Timbertech
_________________ You may be right, I may be crazy, but it just may be a lunatic you're looking for
|
Mon Jul 01, 2019 5:25 pm |
|
 |
DM47
Site Supporter
Location: in a van down by the river (South King County) Joined: Mon Mar 6, 2017 Posts: 292
|
Old Growth wrote: 600 sq feet of cedar would be about 2k Where can I find this? Thx.
|
Tue Jul 02, 2019 4:05 pm |
|
 |
|